Enter project details, building type, number of floors, and structural system. Link to an existing ARCUS Commercial project if applicable.
Project
—
Building Type
—
Floors
—
BUA
—
📋
Client & Project Details
01
🔗 Link to ARCUS Estimator (optional)
Link civil works to an existing Commercial Interiors estimate for unified BOQ
Auto-pulled when platform is live. Enter manually for now.
Link civil works to an existing Residential Interiors estimate for unified BOQ
Auto-pulled when platform is live. Enter manually for now.
✦ Multi-App Project — Both Residential & Commercial linked
Combined BOQ will show Civil + Residential + Commercial totals in the final estimate.
🏗
Building Details
02
Floor-wise Built-up Area (BUA)
Floor
BUA (sq.ft) *
Carpet Area (sq.ft)
TOTAL BUA
0 sq.ft
Used for perimeter → barricading & green net calculation
Drives water tanker, site office & safety provisions on Page 3
⚙️
Structural Parameters
03
Typical bay size. Extracted from structural drawing if uploaded.
Current TMT bar rate at site. Updates material cost.
📝
Scope & Exclusions
04
Contractual Terms
Determines how contractor is paid — lump sum is most common for private projects
Protects both parties when steel/cement prices fluctuate during construction
Penalty for contractor delay — typically 0.5–1% of contract value per week, max 10%
Dispute resolution forum — should match project location
CAR + WC is standard for all civil contracts above ₹10 lakhs
Amount withheld until DLP completion — security against defects
Session 2 of 11 — AI Drawing Analyzer
AI Drawing Analyzer
Upload your architectural drawings — Floor Plan, Elevation, Section, and Structural drawings.
Claude AI reads dimensions, extracts quantities, and auto-populates all civil estimate modules.
Select Floor to Analyze:
Set No. of Floors in Project Info. Each floor plan is analyzed separately and quantities are merged.
📐
Upload Floor Plan
Claude reads: room labels, dimensions, column grid, wall lengths, openings, BUA per zone
JPGPNGPDFWEBP
🏢
Upload Elevation Drawing
Claude reads: building height, façade zones, glazing areas, cladding materials, canopy, parapet
JPGPNGPDFWEBP
✂️
Upload Section Drawing
Claude reads: floor-to-floor heights, slab thickness, beam depth, foundation depth, basement depth
JPGPNGPDFWEBP
⚙️
Upload Structural Drawing
Claude reads: column sizes, beam sizes, slab thickness, foundation type, reinforcement details, steel %
JPGPNGPDFWEBP
Analysing Drawing...
1
Uploading drawing
2
Identifying drawing type & scale
3
Extracting dimensions & quantities
4
Building quantity take-off
✅ Drawing analysed — quantities extracted
📋 Manual Quantity Entry (if drawing not available)
Session 3 of 11 — Earthwork & Site Preparation
Earthwork & Site Preparation
Covers excavation (bulk & trench), backfilling, disposal, levelling, anti-termite treatment,
soling, dewatering, and site clearance. All quantities auto-populated from AI drawing or manual entry.
Estimation Mode
⚡ Quick Estimate: Quantities auto-calculated from project area and soil type.
📐 Detailed Estimate: Enter zone/location-wise measurements manually (per MB format).
Building Use
—
Plot Area
—
Foundation
—
Earthwork Total
₹ 0
🌿
Site Clearance & Demolition
Jungle/shrub clearing, demolition of existing structure, stump removal, debris disposal
₹ 0
›
🚜
Bulk Excavation
Mass earthwork, basement excavation (cum) — mechanised
₹ 0
›
⛏
Trench Excavation
Foundation trenches, column pits, drain trenches — manual + machine
🔹 Water tanker months = Construction duration Page 1 → Construction Duration (months) ★
🔹 Signage count = 1 board per 50 rft perimeter Page 1 → Plot Area (auto-calculated)
⚠️ Fill Plot Area and Construction Duration on Page 1 before navigating to Page 3 for correct auto-population.
📋 Statutory Requirement — As per CPCB guidelines and municipal building bylaws
(GHMC/BMC/BDA), all buildings under construction must be covered with green shade net or
polypropylene sheets to prevent dust and debris from spreading. Barricading is mandatory
for all sites abutting public roads.
⚡ Quick Estimate: Quantities auto-calculated from Page 1 parameters.
Good for feasibility / budget discussions (accuracy ±20%).
📐 Detailed Estimate: Enter measurements element-wise (F1, F2, C1, C2...).
Use for tender / contract BOQ (accuracy ±5%).
Foundation Type
—
Concrete Grade
—
Columns
—
Foundation Total
₹ 0
Live rates from Page 1:
Steel @ ₹72/kg |
Cement @ ₹450/bag |
Grade: — (select on Page 1) |
Depth: 5 ft
Update rates on Page 1 → they reflect here automatically
🪨
PCC — Plain Cement Concrete
M10 blinding / levelling course under all footings & slabs
ℹ️ Precast System: Factory-manufactured elements — delivered and erected on site. Rates include supply + erection + grouting. Connection details vary by manufacturer.
🏭
Precast Columns
Factory-cast columns — supply + erection + grouting per nos / cum
MS columns, beams, trusses, purlins, staircase, handrails, miscellaneous fabrication. Rates per MT supply + fabrication + erection + painting. Driven by live steel price from Page 1.
Estimation Mode
⚡ Quick Estimate: Quantities auto-calculated from BUA and structural type.
📐 Detailed Estimate: Enter member-wise measurements (per rmt, per MT) manually.
Steel Rate
₹68/kg
Est. Tonnage
—
Fabrication Grade
Heavy
Steel Total
₹ 0
Live steel @ ₹68/kg | IS 2062 Grade E250
🔩
Structural Steel Frame
MS columns, primary beams, base plates, connections, anchor bolts — per MT supply + fab + erect
₹ 0
›
🔺
Roof Trusses & Purlins
MS roof truss, Z/C purlins, bracing, ridge, GI/aluminium roofing sheet
₹ 0
›
🪜
Steel Staircase & Handrails
MS open-riser staircase, SS handrail, glass railing, balustrade — per flight / rmt
₹ 0
›
⚙
Miscellaneous Fabrication
Grating, cat ladder, sunshade frame, pergola, anchor bolts, MS grille
₹ 0
›
📊
Structural Steel Summary
Section H
Sub-head
Item
Qty
Unit
Rate (₹)
Amount (₹)
Fill steel items above
TOTAL STRUCTURAL STEEL
Section H
₹ 0
Session 12 of 12 — Civil BOQ & Estimate
Civil BOQ & Estimate
Complete civil & structural abstract of cost, item-wise BOQ, GST, BOCW cess, TDS, and net payable. Links to ARCUS Commercial V1 for combined project estimate.
Civil Works
₹ 0
Commercial Interiors
₹ 0
Combined Total
₹ 0
Net Payable
₹ 0
📋
Abstract of Cost — Civil & Structural
Sec.
Trade / Sub-head
Amount (₹)
Cost / sq.ft
Click "Refresh BOQ" to compile all sections
💼
Consultant Markup & Contingency
🔗
Link — ARCUS Interiors Estimator
No interiors estimator linked. Enter totals on Page 1 to show combined project estimate.
Pull from ARCUS Commercial V1 → Page 14 → Net Payable before GST
Pull from ARCUS Residential V1 → BOQ → Net Payable before GST
⚖
Statutory Levies
Description
Basis
Rate
Amount (₹)
Civil Works Sub-total
All sections A–H
—
₹ 0
Contractor OH & Profit
On sub-total
12%
₹ 0
Contingency & Provisional
On sub-total
5%
₹ 0
Grand Total (Civil)
₹ 0
Commercial Interiors (V1 link)
From ARC-COM ref
—
₹ 0
Combined Project Total
₹ 0
GST on Civil Works
On Grand Total (Civil)
18%
₹ 0
BOCW Welfare Cess
Building & Other Construction Workers Welfare Cess Act, 1996
1%
₹ 0
TDS (Sec 194C)
On contract value
2%
₹ 0
NET PAYABLE (Civil)
Grand Total + GST − TDS
₹ 0
📐
Cost Benchmarks
Civil Cost / sq.ft BUA
₹ —
Structure Cost / sq.ft
₹ —
Combined Cost / sq.ft
₹ —
Total BUA
— sq.ft
ARCUS Engineering Services
Civil & Structural Estimator V1
Ref No.
—
Project
—
Client
—
Location
—
Total BUA
—
Structural System
—
Date
—
Concrete Grade
—
Rate Validity
—
Steel Rate
—
SL
Item Description
Qty
Unit
Rate (₹)
Amount (₹)
Click "Build Item-wise BOQ" to compile all sections
Scope of Works
—
Exclusions
—
Contractual Terms
Contract Type
—
Payment Terms
—
Defect Liability Period
—
Price Escalation
—
Liquidated Damages
—
Retention Money
—
Insurance
—
Arbitration & Jurisdiction
—
Construction Duration
—
Prepared by — ARCUS Engineering Services
Consultant Signature & Stamp
Accepted by — Client
Client Signature & Date
Bill of Materials
Derived from IS 456 mix design ratios · Quantities based on entered measurements
Assumptions:
Mix design per IS 456 · Steel ratios per IS 456 standard percentages ·
All-in rates split into material + labour (material ≈ 60%, labour ≈ 40%) ·
5% wastage added on all materials ·
Actual consumption may vary based on site conditions.
📦 Consolidated Material Schedule
—
S.
Material
Quantity
Unit
Rate (₹)
Amount (₹)
Source Sections
Click Recalculate BOM to generate material schedule from entered quantities.